Skip to content
Density Port Lab Interior Weight Port Fitting
Build Times

How Long a Build Takes

Once a port arrangement is locked at the bay, the build itself is mostly a question of what's already on the shelf versus what has to come from a manufacturer.

What Drives the Timeline

Port Adjustment vs. Full Rebuild

If your session ends with a port reweight on a head you already own, that's usually a same-day or next-day job — the ports are pulled, reweighted to spec, and torqued back in with the swingweight rechecked on the scale. A full build on a new head with a shaft install typically runs two to four business days when components are in stock.

Full iron sets with a set-wide port audit take longer, since every head gets weighed and corrected individually before the set is rechecked against the gapping printout.

Typical Turnaround
Port reweight, existing headsame day–1 day
New build, stock components2–4 days
Full iron set audit5–7 days
Special-order head/shaft+ mfr. lead time

Ask Before You Book

Call ahead and we'll give you a realistic timeline based on current stock and bay load.